天航机械装备专业机械装备制造商,为您的事业保驾护航
全国服务热线: 400-005-9009
EN

中国石灰装备行业先行者

专业石灰窑设备制造商 | 致力于为客户提供高效、节能、环保的解决方案

立足产品 服务社会

尽人之智,以诚为本,为环保事业做出贡献

专利证书齐全 技术实力行业领先

公司生产的具有自主知识产权的气煤两用石灰竖密,拥有十余项专利;公司生产的回转窑设备、双膛窑、套筒窑等产品,从能耗、设备运转、环保产品质量等各项指标均走在了行业的前列。

设备齐全 经验丰富

公司占地面积22000余平方米,由机加工、铆焊、装配等车间组成。拥有各种先进设备110台,加工设备先进,加工范围大,产品精度高。

News Center

新闻中心

What are the precautions when installing a lime kiln?

The environmentally friendly lime kiln is equipped with a dust discharge valve, which can reduce the heat transfer efficiency. Finding a suitable location during installation is crucial to ensure the effective operation of the lime kiln; Regularly check whether each operating system is normal, whether the dust exhaust valve operates flexibly, and whether its weight ratio is reasonable, neither too much nor too little. When there is too much, it can cause unstable punching, and in severe cases, it can lead to short circuits. When there is too little, it can result in poor sealing, loose closure, and internal air leakage. In severe cases, it can cause material collapse in the system.

点击查看详情 >>

What are the points to pay attention to when installing calcium hydroxide equipment

Calcium hydroxide equipment has a wide range of applications in chemical, building materials and other fields, and its installation process is crucial, directly related to the operational efficiency and safety of the equipment. Here are a few things to pay attention to when installing equipment:1. The preparation work before installation should be sufficient. Before installation, it is necessary to understand the structure, performance, and usage conditions of the equipment and develop a reasonable installation plan. At the same time, prepare the necessary tools and materials, such as lifting machinery, forklifts, screws, bolts, etc., and ensure their reliable quality.2. The basic production and inspection should be rigorous. Design and construct a suitable foundation structure based on the weight and usage requirements of the equipment, ensuring that the foundation has sufficient bearing capacity and stability. After the completion of the basic production, strict inspection is required, including the position of the foundation coordinates, elevation, and overall dimensions of the plan. Heavy equipment foundation preloading tests are also required to prevent uneven settlement of the foundation after equipment installation.3. The installation process of the equipment should be accurate. During the positioning process of the calcium hydroxide equipment, the levelness and verticality of the equipment should be ensured to avoid poor operation or damage caused by installation errors. At the same time, pay attention to the connection of pipelines and valves to ensure smooth fluid flow, and pay attention to the sealing and smoothness of pipelines to avoid leakage or blockage.4. The installation and debugging of the electrical part should be standardized. According to the design requirements, correctly connect electrical components with power and control circuits, and install and debug electrical protection devices to ensure the safety and stability of the equipment during operation.5. The debugging and acceptance after installation should be meticulous. Conduct no-load and load test runs to check whether the operation and performance indicators of each component of the equipment meet the requirements. After debugging is completed, acceptance work will be carried out to confirm that the equipment meets the design requirements and has the ability to operate normally.In summary, the installation of calcium hydroxide equipment is a complex and delicate process that requires sufficient preliminary preparation, rigorous foundation fabrication and inspection, accurate equipment placement and installation, standardized electrical installation and commissioning, as well as meticulous commissioning and acceptance. Only in this way can we ensure the smooth operation and efficient production of the equipment.

点击查看详情 >>

What are the precautions for installing and debugging calcium hydroxide equipment?

You need to know that most devices require installation and debugging during use. Therefore, calcium hydroxide equipment is no exception, and debugging work is also carried out during equipment installation. Now let's talk about installing and debugging equipment.    Due to the fact that calcium hydroxide equipment is an integrated device, it occupies a large area and has multiple external conditions. This requires preparing the necessary equipment in advance according to the manufacturer's recommendations. External environment.        When installing and debugging calcium hydroxide equipment, attention should be paid to mutual cooperation, that is, the cooperation between users and technicians. Firstly, prepare the necessary raw materials, labor, and lifting equipment for installation. This will greatly improve the efficiency of installation and debugging with the support of both parties, achieving a mutually beneficial situation.

点击查看详情 >>